The Georgia Department of Transportation has announced the latest round of lane and ramp closures and other traffic changes for Transform 285/400, its massive project to reconstruct the I-285/Ga. 400 interchange.
Schedules may change based on the work and the weather.
Ashford-Dunwoody Road ramp closures
Jan. 29-Feb. 1, 9 p.m. to 5 a.m., ramp to I-285 westbound closed.
Ga. 400 ramp closures
Jan. 24-26, 9 p.m. to 5 a.m., southbound and northbound ramps to I-285 eastbound closed.
Jan. 27-29, 9 p.m. to 5 a.m., southbound ramp to I-285 eastbound closed.
Jan. 29-Feb. 1, 9 p.m. to 5 a.m., southbound ramp to I-285 westbound closed.
I-285 ramp closures
Jan. 24-26, 9 p.m. to 5 a.m., eastbound ramp to Ga. 400 northbound closed.
Jan. 27-Feb. 1, 9 p.m. to 5 a.m., westbound ramp to Ga. 400 northbound closed.
Jan. 27-29, 9 p.m. to 5 a.m., eastbound ramp to Glenridge Drive closed.
I-285 lane closures
Jan. 24 and 27-29, 9 p.m. to 5 a.m., eastbound between Peachtree-Dunwoody Road and Perimeter Center Parkway, two right lanes.
Jan. 27-30, 9 p.m. to 5 a.m., westbound between Peachtree-Dunwoody Road and Glenridge Drive, various lanes (two right and two left).
Jan. 27-30, 9 p.m. to 5 a.m., eastbound between Glenridge Drive and Ga. 400, various lanes (two right and two left).
Lake Forrest Drive closure
Jan. 27-Feb. 1, 9 p.m. to 5 a.m., closed between Allen Road and Northwood Drive.
Other traffic changes
On Jan. 24 and 27-29, 9 p.m. to 5 a.m., the Ashford-Dunwoody Road ramp to I-285 westbound will have flagging.
On Jan. 24-26, 9 p.m. to 5 a.m., Ga. 400 northbound between Glenridge Connector and Hammond Drive will have traffic pacing (police forcing other vehicles to slow or stop).
On Jan. 24-26, 9 p.m. to 5 a.m., I-285 eastbound between Roswell Road and Ga. 400 will have traffic pacing (police forcing other vehicles to slow or stop).
On Jan. 25 and 26, 7 a.m. to 7 p.m., Abernathy Road eastbound and westbound between Barfield Road and Ga. 400 will have traffic pacing (police forcing other vehicles to slow or stop).
On Jan. 27, 29 and 31, 1:30-2 p.m., I-285 eastbound between Roswell Road and Perimeter Center Parkway will have traffic pacing (police forcing other vehicles to slow or stop).
The I-285 eastbound and westbound ramps to Ga. 400 will have periodic traffic pacing (police forcing other vehicles to slow or stop) between 7 a.m. and 7 p.m.
